I3 (2 points)
https://knobit.org/id/task/dg-issue-escalation-closure/I3
Also as Turtle · JSON-LD · RDF/XML
| dcterms:license | https://creativecommons.org/licenses/by/4.0/ |
|---|---|
| owl:sameAs | https://bitbucket.org/reffa/ontology/id/task/dg-issue-escalation-closure/I3 |
| rdfs:label | I3 (2 points) en |
| schema:hasPart | dg-issue-escalation-closure I3: next lifecycle step per issue |
| schema:hasPart | dg-issue-escalation-closure I3: lifecycle stated in order |
| schema:identifier | I3 |
| schema:position | 6 |
| schema:text | The issue lifecycle. (a) next_step, 0.25 each: GI-043 none (decided by the right holder, written back, verified, closed); GI-045 write_back (decided, the standard not yet updated - not verify or close); GI-048 escalate (past due_by 2026-10-15 with no escalation), or decide if the answer itself records the escalation to GB-001; GI-050 decide. (b) 1 point: Part B states the lifecycle in order - raised as a question, routed to the decider of its decision type, escalated one level when it passes its due date, decided by the holder of the right, written back to the deliverable it changes, verified as applied, then closed - with write-back and verification before closure. en |